Testimonials

“If they discover a problem, they come to you with a solution, seeking your approval, rather than relying solely on the plant owner to do all the thinking. This proactive approach allows for smoother flow of work and also demonstrates that they have an understanding and drive for getting it done.”

Jim Peachey, Engineer, Loy Yang A Power Station


“Under extreme pressure and with very little prior notice, we engaged MMS in the removal and installation of two boiler main stop valves. During this engagement, I was impressed with their ‘can do’ attitude. I noticed that whenever a problem arose they found a solution and moved on with the task.”

Brett Harrington, Engineer, Ecogen Energy – Newport Power Station


“We go to tender for outage contracts so MMS needs to be open and transparent. They have won our outages over the past several years because of their capacity to meet our time requirements, their commitment to occupational health and safety, and their ability to come in within budget. Quality Assurance is a critical factor as we are dependent on plant that continues to operate productively and safely, with minimum downtime and MMS delivers without exception.”

Roger Rejmer, Outage Manager, Loy Yang B Power Station